    Site Updates and Management Team Visits

    December 8th, 2017 Posted by General 0 thoughts on “Site Updates and Management Team Visits”

    This past week saw the Directors and Management getting round to each of our sites together. All developments are progressing on schedule heading in to the Christmas holidays. See below for work updates:

    Isabella Apartments:
    Striking of scaffold is continuing on the final two elevations with decorating and final snagging progressing to 1st, 2nd and 3rd floors in preparation for being offered to the client. Dry-lining 2nd fix is now in progress on the upper floors with the plan to have all plots closed up prior to the Christmas break.

    Dartmouth Road:
    Finishes to the roof are now progressing and a programme to commence scaffold striking is currently being finalised in advance of the removal of the tower crane on the 20th January 2018.
    Dry-lining 2nd fix is now in progress with mist coating and 2nd fix programmed to commence prior to the Christmas break.

    Hendon Broadway:
    The first floor slab of Block A is currently being formed, with the progression beyond this level reliant on the erection of the tower crane in January 2018.

    Spurstowe Terrace:
    The site hoarding has started to go up in advance of the soft strip demolition this month. The main demolition works will take place in January.

    Head Office

    83 Victoria Road
    Chislehurst,Kent, BR7 6DE
    0203 824 4300
    info@beamridge.com

    London Office

    17 Hanover Square
    Mayfair, London, W1S 1HU
    0203 824 4300
    info@beamridge.com

    Copyright © 2017 Beamridge. All rights reserved. Theme designed by HighGrade.

    %d bloggers like this: