    Caterham Works Update

    March 5th, 2019 Posted by Updates 0 thoughts on “Caterham Works Update”

    On our Caterham site, piling is due to be completed within the next couple of weeks and the substructure works will commence then. Final demolition works on the Waitrose car park boundary also nears completion. At which point, the hoarding around the site will be realigned and replacement gates will be fitted to these areas.

    Spurstowe Terrace Works Update

    March 5th, 2019 Posted by Updates 0 thoughts on “Spurstowe Terrace Works Update”

    Works to the basement at Spurstowe Terrace have recently involved gas boilers and the main water tank  being fitted, along with the required pump system. The heating distribution pipework has been completed and the foul drainage connections are well on their way.

    The steel frame and composite concrete transfer deck has been completed from the ground floor to the first floor. The perimeter SIP’s have been completed from the first to the second floor and internal load-bearing walls are currently in the process of being erected.

    West Hendon Broadway Update

    March 5th, 2019 Posted by Updates 0 thoughts on “West Hendon Broadway Update”

    Works are progressing well at West Hendon with the external element allowing the scaffold to be struck to reveal the finished brick, render and metal cladding to the building’s façade.

    Internally the 43 units, split between shared ownership and rented accommodation, are entering into the finishing section of the works, with total client satisfaction. The project is programmed to be complete in the middle of this year.

    Isabella Apartments Update

    November 14th, 2017 Posted by Updates 0 thoughts on “Isabella Apartments Update”

    The Lewisham development is on course for completion at the start of 2018. The external scaffolding is now being removed ready for external hard landscaping to begin.
    The internal Apartments are being completed and brought up to standard for the client sign off.
    More information about this project can be found here.

    Head Office

    83 Victoria Road
    Chislehurst,Kent, BR7 6DE
    0203 824 4300
    info@beamridge.com

    London Office

    17 Hanover Square
    Mayfair, London, W1S 1HU
    0203 824 4300
    info@beamridge.com

    Copyright © 2017 Beamridge. All rights reserved. Theme designed by HighGrade.