    Spurstowe Terrace

    May 2nd, 2018 Posted by 0 thoughts on “Spurstowe Terrace”

    Project Details

    Location: Hackney, London
    Value: £6,500,000
    Programme Duration: 18 Months
    Client: Urbanista

     Project Details

    Piling has recently started at our Spurstowe Terrace development in Hackney E8, on a 24 unit scheme for our client, Urbanista. The site is flanked on two sides by existing residential and commercial buildings and the management team have had to work closely with the client in order to ‘resolve some challenging party wall conditions.

    The apartments will be launched for sale in September with the development programmed for completion in February 2019.

    Caterham

    January 1st, 2018 Posted by 0 thoughts on “Caterham”

    Project Details

    Location: Caterham, Kent
    Value: £14,000,000
    Programme Duration: 2 years
    Client: Clarion Housing Group

     Project Details

    We are delighted to announce that we have entered into contract with Clarion to build 48 apartments over a Lidl Supermarket in Caterham, Kent, on the site of the old Mercedes showroom.

    Following demolition, which is scheduled to start in May, we have a challenging five level basement to construct which will include an extensive temporary works design process. This will be followed by an RC Frame above ground floor with a range of façade treatments.

    West Hendon Broadway

    March 9th, 2017 Posted by 0 thoughts on “West Hendon Broadway”

    Project Details

    Location: Edgware, London
    Sector: Residential
    Value: £8,500,000
    Completion Date: February 2019
    Client: Affinity Sutton Homes

     Project Details

    This development consists of 42 affordable apartments over a commercial unit with basement car parking.

    The RC frames on both blocks are now complete with a ‘Metsip’ panel system being installed in advance of the main façade. Work continues to programme with completion expected early 2019.

    CG Image rights belong to Trout Rise Developments.

    Isabella Apartments

    January 31st, 2017 Posted by 0 thoughts on “Isabella Apartments”

    Project Details

    Location: Lewisham, London
    Sector: Residential
    Value: £5,220,000
    Timescale: 81 Weeks
    Client: Hexagon Housing

     Project Details

    A new build development comprising of 28 dwellings, a mixture of affordable/shared housing tenure, plus Commercial unit located in Lewisham,
    London.

    This is a high quality innovative construction process, firstly requiring a high complexed decontamination and site clearance process, followed by a piled foundation, reinforced suspended slab, Steel Frame Structure, with a Metsec Infill and Brick Cladding system.

    Designed to meet level 4 Code for Sustainable Homes or better and Lifetime Home/Building for Life requirements.

    Image rights belong to architects Timothy Associates.

    Dartmouth Road

    January 9th, 2017 Posted by 0 thoughts on “Dartmouth Road”

    Project Details

    Location: Forest Hill, London
    Sector: Residential
    Value: £6,017,000
    Timescale: 81 Weeks
    Client: Hexagon Housing

     Project Details

    A new build development of 27 Dwelling Affordable Housing units plus commercial space in Forrest Hill, London.

    The build process consists of Demolition and site clearance, Piled Foundation, Concrete Framed Structure, with a Metsec infill and a traditional brick finish.
    Designed to meet level 4 Code for Sustainable Homes or better and Lifetime Home/Building for Life requirements.

    Lansdowne Mews

    January 1st, 2017 Posted by 0 thoughts on “Lansdowne Mews”

    Project Details

    Location: Charlton, London
    Sector: Residential
    Value: £2,000,000
    Timescale: 42 Weeks
    Client: Private

    Project Details

    This development consists of 8 town houses (each with 4 bedrooms) in Charlton, London for a private developer. The new houses, each with private roadway, drives and associated landscaping, are within arm’s reach of Charlton Athletic Football Club in Williams Close.

    The Spinney

    December 19th, 2016 Posted by 0 thoughts on “The Spinney”

    Project Details

    Office: Farnborough Park, Orpington
    Sector: Private
    Value: £3,500,000
    Size: 15000sqft
    Timescale: 72 Weeks
    Client: Private Client

     Project Details

    A luxury residential development in South East London. Works are ongoing.

    Four Oaks

    December 18th, 2016 Posted by 0 thoughts on “Four Oaks”

    Project Details

    Office: Farnborough Park, Orpington
    Sector: Private
    Value: £3,700,000
    Size: 12500sqft
    Timescale: 72 Weeks
    Client: Private Client(Joint Venture)

     Project Details

    A luxury residential development in South East London.

    Forest Drive

    December 18th, 2016 Posted by 0 thoughts on “Forest Drive”

    Project Details

    Office: Keston Park, Orpington
    Sector: Private
    Value: £2,800,000
    Size: 9500sqft
    Timescale: 64 Weeks
    Client: Private Client(Joint Venture)

     Project Details

    A luxury residential development in South East London.

    Chrisp Street

    February 18th, 2016 Posted by 0 thoughts on “Chrisp Street”

    Project Details

    Office: Langdon Park, London
    Sector: Commercial
    Value: £8,700,000
    Timescale: 94 Weeks
    Client: Vasthouse Homes Ltd

     Project Details

    The development for Vasthouse Homes (part of Galliard) near Langdon Park DLR, it consists of 59 apartments of either three, two or one bedrooms.

    Head Office

    83 Victoria Road
    Chislehurst,Kent, BR7 6DE
    0203 824 4300
    info@beamridge.com

    London Office

    17 Hanover Square
    Mayfair, London, W1S 1HU
    0203 824 4300
    info@beamridge.com

    Copyright © 2017 Beamridge. All rights reserved. Theme designed by HighGrade.